Burwood Beach Wastewater Treatment Plant Bypass, NSW
Recently, NPE were engaged by regional water authorities to supply and install a 20” diesel bypass pump from a collection pit to the ABF tower to begin a flushing program on the ABF tower. The client required 450mm polyline and flows up to 450l/s at 24m rise.
The discharge location was located at the ABF Tower rising main 160m from the pump location, discharged by 450mm poly. Their system was configured to notify a predetermined list of mobile numbers, including NPE staff, with an alarm text in the case of high or low levels, which could cause overflow.
Wastewater Treatment Plant – Digester Cleaning in South Australia
NPE was engaged by Fulton Hogan to undertake the full cleaning of Digester #6 at the Bolivar Wastewater Treatment Plant…
Huntingdale Sewer Infrastructure Dewatering Project
Huntingdale Sewer Infrastructure Dewatering Project – Case Study The Huntingdale dewatering project involved installing more than 1.2 km of new…
High-Performance Pumping Solutions for Extreme Weather Events- QLD
Quarry pit dewatering is essential for maintaining safe, accessible, and productive operations. When rainwater or groundwater accumulates in an active…
NPE Bypass Solutions for Black Rock Water Reclamation Plant
National Pump & Energy (NPE) was engaged by AMH Civil to deliver a full bypass solution for the Black Rock…
Wet Season Management in North-West Queensland Mining
NPE supported a remote north‑west Queensland site after heavy rainfall, with 370 mm recorded in seven days. The rain temporarily…
Royal Far West Manly Dewatering
NPE was awarded a dewatering and water treatment project to facilitate construction activities. To manage this project effectively, the temporary…
PFAS Treatment Perth, WA
The treatment process begins with a dewatering system that extracts groundwater for processing. The influent is conveyed through the plant,…