Bayswater Power Station Project, NSW

NPE is carrying out daily onsite system checks.

The chemical dosing units are also remotely monitored via telemetry and provide logging of water quality data.

A valued client has contracted us to dewater a coal settling basin to facilitate excavation works to remove coal fines/sediment from the basin to increase water storage capacity.

The basin holds approximately 45ML of water which has continuous inflows. The water requires treatment using a combination of chemicals to remove the coal fines (suspended solids) before being discharged to a local water catchment.

Bayswater Power Station Project, NSW

Requirements, Equipment and Images

Get in touch to discuss your requirements...

Call Us

NPE has not only one of the largest ranges of specialised equipment, but also the most qualified professionals in pumping and power generation in Australia.

Visit A Location

The NPE branch network is strategically positioned to service all parts of Australia. These hire branches are supported by a team of NPE representatives and field service crews.

© National Pump & Energy 2024