Kings Square Development Project

The Kings Square Project was situated in the middle of Perth City Link and is a Western Australian Government Project. This project saw the creative collaborative works of several head contractors such as John Holland Group, Broad Constructions and Broad Civil. NPE were the preferred dewatering contractor during the development of the first four buildings, KS1, KS2, KS3 and KS4. Our scope of works included design and delivery of all dewatering works onsite as well as treatment and disposal of water in accordance with the dewatering management plan and legislative requirement. The project involved drilling of recharge wells and bore holes fitted with slotted casing and electric submersible pumps.

This system was set up to dewater up to 15 litres of water a second and extracted waters are treated via an NPE Metal Removal Modules and reinjection systems. Our water treatment process gathered interest from The Department of Environment and Conservation due to its ability to comply to the strict testing and reporting requirements outlined.

Powering Remote Mining Operations with Reliable Off-Grid Energy

National Pump & Energy was engaged to deliver and commission a complete remote power solution to support critical underground services…

Sewer Treatment Plant Wellpoint Dewatering – NSW

National Pump & Energy (NPE) was engaged to provide a wellpoint dewatering solution for the construction of two new clarifiers…

Pipeline Dewatering Specialists: Wellpoint Installation for Belmont Infrastructure Project

As part of a 6km pipeline installation project in Belmont, our client successfully completed almost the entire pipeline without requiring…

Wellpoint Dewatering Solution Delivered for Modcon Civil- SA

Our South Australian team was recently engaged by Modcon Civil to design and deliver a tailored dewatering solution in Robe,…

Eastern Treatment Plant Bypass – Melbourne, VIC

National Pump & Energy deliver bypass works for the incoming side of one of Melbourne’s busiest treatment plants. Eastern Treatment…

Bore Pump Installations & Commissioning – Kalgoorlie WA

The Kalgoorlie branch has recently completed a large run of bore pump installations and commissioning works across several sites. Over…

DN630 Pipeline Welding & Installation Project – Queensland

National Pump & Energy (NPE) was engaged to deliver specialised support for a DN630 HDPE pipeline installation as part of…