Brisbane Airport QLD

McConnell Dowell was awarded the contract for the Dryandra Road Works, a significant structural element of the New Parallel Runway by Brisbane Airport Corporation (BAC). The Dryandra Road Project is a reinforced concrete 4-lane underpass structure, supported on approximately 700 precast concrete piles including 1.5km of roadway, full underpass fit-out with portions of taxiway and airfield road mounted atop the underpass structure.

We were able to complete the entire dewatering project with zero environmental compliance issues. Given the high level of scrutiny around water quality and the high number of auditing and compliance checks this was a major achievement.The process ensured the installation of the dewatering and water treatment facility was completed on time and within the allowed contract milestone dates set and agreed to prior to works commencing on site.

NPE’s wellpoint design meant that a single line wellpoint system could be used on site to effectively dewater a large multilayered ground strata excavation without placing any hydrostatic load on the sheet pile shoring system. Historically in these difficult and complex types of ground conditions this could have only been achieved using multiple staged or stepped down system. In this case this would have proven unacceptable given the increased footprint required, additional time needed to install and the increase in construction costs.

NSW Central Coast Sewer Bypass Upgrade

National Pump & Energy was engaged to design, supply, install, and maintain a temporary sewer bypass pumping system to support…

Jovan Qualifies as Mechanical Fitter in Newcastle NSW | Apprenticeship Success

We are proud to announce that Jovan has officially qualified as a Mechanical Fitter after successfully completing his apprenticeship at…

Proud Entertainment Sponsor of the CCFWA Awards Night 2026

The CCFWA Awards Night 2026 was a fantastic evening celebrating excellence across Western Australia’s civil construction industry. We were proud…

Residential Development Dewatering & Water Treatment – Calderwood, NSW

Building on the success of long-term dewatering and water treatment works in the Illawarra region, National Pump & Energy (NPE)…

Jack Achieves Tradesman Qualification at NPE Perth Branch in Western Australia

We are proud to announce that Jack has officially qualified as a Tradesman after successfully completing his apprenticeship at NPE…

Restart Ready: Delivering Critical Pontoon Pumping Power in Queensland

National Pump and Energy (NPE) are the industry-leading Water Management and Treatment Solutions experts. Offering Dewatering, Bypass Pumping, Pump Hire…

Large-Scale Evaporation for TSF Risk Reduction

Our client required a 24-unit evaporator fan package at a North-West Queensland Mine site to lower water levels within the…