Belconnen Trunk Sewer Augmentation – ACT
NPE were engaged to perform a critical bypass required in order for our client to complete the final stage of a major project building additional capacity and redundancy into the local water authorities wastewater network. NPE’s role was to install, commission and manage the sewer via a pumped overland bypass in order to provide a dry double isolated pipeline that would allow our client to complete their tie works. The window for installation and completion of the works was extremely tight. Access was difficult as the alignment ran parallel to a major roadway where the pipe alignment snaked through a sensitive green site where disturbance to the local flora was to be kept to a minimum.
NPE designed a sewer bypass system where we supplied 4 x BA300E pumps to ensure that the nominated PDWF rate of 650 l/s with 100% redundancy could easily be achieved whilst still providing additional capacity to meet higher PWWF that were likely to be encountered during the tight project timeline due to the stormy and unpredictable wet weather the area had been receiving.
Due to the critical nature of the project and tight time frames of operation, NPE provided 24/7 on-site monitoring in conjunction with the telemetry system to ensure that the risk of overflow was removed in the event of ramping the bypass up to cater for PWWF due to the shallow collection manhole for the bypass and presence of an overflow point upstream which meant levels within the bypass collection manhole had to be kept to a minimum at all times.
Jovan Qualifies as Mechanical Fitter in Newcastle NSW | Apprenticeship Success
We are proud to announce that Jovan has officially qualified as a Mechanical Fitter after successfully completing his apprenticeship at…
Proud Entertainment Sponsor of the CCFWA Awards Night 2026
The CCFWA Awards Night 2026 was a fantastic evening celebrating excellence across Western Australia’s civil construction industry. We were proud…
Residential Development Dewatering & Water Treatment – Calderwood, NSW
Building on the success of long-term dewatering and water treatment works in the Illawarra region, National Pump & Energy (NPE)…
Jack Achieves Tradesman Qualification at NPE Perth Branch in Western Australia
We are proud to announce that Jack has officially qualified as a Tradesman after successfully completing his apprenticeship at NPE…
Restart Ready: Delivering Critical Pontoon Pumping Power in Queensland
National Pump and Energy (NPE) are the industry-leading Water Management and Treatment Solutions experts. Offering Dewatering, Bypass Pumping, Pump Hire…
Large-Scale Evaporation for TSF Risk Reduction
Our client required a 24-unit evaporator fan package at a North-West Queensland Mine site to lower water levels within the…
Onsite Ammonia Treatment and Discharge Enablement – Newcastle
National Pump & Energy (NPE) were engaged to address elevated ammonia levels in a client’s storm water retention pond after…