Posts by Alex Boynes
Thickener Tank Cleaning – Goldfields WA
During the February Processing Plant shutdown, maintenance tasks were carried out simultaneously on Nickel and Copper Thickeners. Tool time requirement was 96 hours, and all four thickeners were required to be emptied and cleaned within a 12-hour shift. Our client cannot achieve this in-house; therefore, historically, they only attempted to maintain 1 or 2 thickeners…
Read MoreRigCool – Offshore Asia
Water winning and high pressure, high volume booster pumps for offshore heat suppression system. Services Provided:
Read MoreProviding Camp Power – Pilbara WA
National Pump and Energy, keeping lights on in the Pilbara. This 300+ person mining camp is powered by four Cummins 500kVa generators. They provide power to the kitchen, their fridges and freezers, rooms and TVs, gymnasium and office areas. These areas are also kept nice and cool by powering their air conditioners.
Read More