BMA wanted to access a submerged coal gas seam, but in order to do so, they needed to remove fines from the pit.
NPE were engaged to supply a turnkey solution for the removal of the settled mine silts – SG 1.6 – utilising insitu and recycled water, 120lt/sec @ 30% solids recovery rate.
Requirements
Supply turnkey solution for the removal of settled silts.
Equipment
- Variable speed hard iron submersible pump unit mounted on an excavator
- 300hp hard iron booster pump system complete with discharge and water recycling pump equipment
- D8T dozer
- 20T excavator
- Rubber discharge pipe work to effect full system hook up and return water system