Chat with us, powered by LiveChat

Water Management – Dewatering - Project Management

BMA – Goonyella Riverside Mine, Queensland

Ramp ‘O’ Dewatering

NPE delivered on the job requirements of designing and supplying a fully automated diesel powered high flow pumping system to a duty of 720lt/sec @ 120m tdh, managing collected rain and mine water.

Services provided include: Engineer and design, installation, commissioning, maintenance, pipe route advice and design.

Requirements

Design and supply fully automated diesel powered high flow pumping system to a duty of 720lt/sec @ 120m tdh.

Equipment

  • Pontoon mounted system
  • 600hp engines in split frame chassis
  • 200lt/sec pumps to 18bar Additional Equipment
  • 22,000lt bulk fuel tanks
  • Flow meters
  • Check valves and associated flow control
  • Back to base monitoring with full remote control capability
  • Service vessel

National Pump & Energy have the people, products and expertise to deliver on your project needs. For more information contact us today.

© 2018 National Pump & Energy | Web design and development RJ New Designs and Big Blue Creative.