Pump Hire & Dewatering supplied by NPE following recent heavy rain a Gold Coast quarry filled with excessive stormwater which stopped production. NPE were called to supply pumps and hose to remove 900,000,000 litres of water from the area.
NPE supplied 2 x 8″ pumps and hose to run 24/7 for 20 days to remove the water so that the area could be returned to a safe and productive area.
Requirements
Dewater 900,000,000 litres within the quarry in 20 days.
Equipment
BBA BA180E 8″ Diesel Drive Pump
Pioneer PP88S12 8″ Diesel Drive Pump
8″ Layflat Hose
Transport, Installation and system maintenance
National Pump & Energy have the people, products and expertise to deliver on your project needs. For more information contact us today.