Wellpoint Dewatering

Wellpoint dewatering of construction site to enable the excavation of basement car park and foundations.

Wellpoint Dewatering

NPE’s wellpoint dewatering was the perfect solution for the construction of the high-rise residential complex in Brisbane. The site borders the Brisbane river and because of this the underground water was an issue for the basement excavation.

NPE were contracted to conduct the dewatering and extract the water to enable the excavation and basement foundation works without the site being flooded from the underground water. To successfully plan and complete works, NPE representatives conducted a site visit and designed an appropriate system. Delivered materials to site and installed and completed dewatering activity.

The wellpoint dewatering was highly efficient and was successful in removing thousands of litres of water from the multi-million dollar development site.

Wellpoint Dewatering

Requirements, Equipment and Images

The perimeter dewatering system comprised of 100 underground collection points and over 200m of pipe installed and monitored by NPE technicians.

  • 2 x super silent diesel pumps
  • Filtration tank
  • Dosing pump
  • Flexdrive pumps
  • Monitoring Meters
  • All hoses, piping and ancillary equipment
  • Experienced dewatering technicians

Get in touch to discuss your requirements...

Call Us

NPE has not only one of the largest ranges of specialised equipment, but also the most qualified professionals in pumping and power generation in Australia.

Visit A Location

The NPE branch network is strategically positioned to service all parts of Australia. These hire branches are supported by a team of NPE representatives and field service crews.

© National Pump & Energy 2024

Website created by RJ New Designs