This water was directed to a newly constructed holding dam where our pump was located.
We were then tasked to install multiple pipelines from the UG pump station to the holding dam and from the holding dam to the process water dam.
A high-flow NPE diesel pump was installed and commissioned by one of our NPE pump technicians.
NPE then sets up a high/low water level system using a level transducer within this holding dam to allow this water to transfer to the process water dam at a consistent rate.
This provided precious water to the mill to assist with processing on site.
This project was installed and commissioned efficiently within the client’s timeframe and budget.