Remove Tailings, Fines & Slimes

NPE provided specialist hydromining services to the Kalgoorlie Consolidated Gold Mine, to remove tailings slimes from secondary settling dam. Tailings slurry was pumped back into primary settling dam.

Hydromining - Project Management

NPE provided specialist hydromining services to the Kalgoorlie Consolidated Gold Mine, to remove tailings slimes from secondary settling dam. Tailings slurry was pumped back into primary settling dam. Services included engineering and design, complete product recovery, dam cleaning and reinstatement.

Remove Tailings, Fines & Slimes

Requirements, Equipment and Images

Removal of tailings slimes from secondary settling dam. Tailings slurry to be pumped back into primary settling dam.

  • Remote controlled 6” hydromining monitor
  • Water winning pump system
  • High pressure booster delivery pump
  • Variable speed hydraulic product recovery pump
  • Slurry booster system
  • Calibrated flow management equipment
  • Lighting
  • Mobile re-fuelling equipment
  • Bulk fuel supply

Get in touch to discuss your requirements...

Call Us

NPE has not only one of the largest ranges of specialised equipment, but also the most qualified professionals in pumping and power generation in Australia.

Visit A Location

The NPE branch network is strategically positioned to service all parts of Australia. These hire branches are supported by a team of NPE representatives and field service crews.

© National Pump & Energy 2024

Website created by RJ New Designs