Removal Of Fines From Pit

NPE were engaged to supply a turnkey solution for the removal of settled silts.

Hydromining - Project Management

BMA wanted to access a submerged coal gas seam, but in order to do so, they needed to remove fines from the pit.

NPE were engaged to supply a turnkey solution for the removal of the settled mine silts – SG 1.6 – utilising insitu and recycled water, 120lt/sec @ 30% solids recovery rate.

Removal Of Fines From Pit

Requirements, Equipment and Images

Supply turnkey solution for the removal of settled silts.

  • Variable speed hard iron submersible pump unit mounted on an excavator
  • 300hp hard iron booster pump system complete with discharge and water recycling pump equipment
  • D8T dozer & 20T excavator
  • Rubber discharge pipe work to effect full system hook up and return water system

Get in touch to discuss your requirements...

Call Us

NPE has not only one of the largest ranges of specialised equipment, but also the most qualified professionals in pumping and power generation in Australia.

Visit A Location

The NPE branch network is strategically positioned to service all parts of Australia. These hire branches are supported by a team of NPE representatives and field service crews.

© National Pump & Energy 2024

Website created by RJ New Designs