Murray Bridge Refurbishment, SA

After recent Murray River flooding, NPE rapidly supplied and mobilized a pump and 700m hose to move 800,000,000 litres behind a levee bank, aiding the Old Murray Bridge Refurbishment Project and dewatering the area within 5 weeks, meeting client needs promptly.

Due to the recent Murray River flooding, NPE was tasked with supplying a pump set up to move 800,000,000 litres behind a levee bank as soon as possible so that the client could continue with their main works for the Old Murray Bridge Refurbishment Project. NPE quickly mobilised the pump and 700m of hose to the site, delivering an effective solution that met the client’s requirements. This area was dewatered in 5 weeks.

Murray Bridge Refurbishment, SA

Requirements, Equipment and Images

Get in touch to discuss your requirements...

Call Us

NPE has not only one of the largest ranges of specialised equipment, but also the most qualified professionals in pumping and power generation in Australia.

Visit A Location

The NPE branch network is strategically positioned to service all parts of Australia. These hire branches are supported by a team of NPE representatives and field service crews.

© National Pump & Energy 2024

Website created by RJ New Designs