Hydromining – Thickener Tank Clean

Removal of several years of built up material in the main process water and thickener feed tanks of the processing plant in order to gain capacity in the tanks.

Hydromining - Project Management

NPE provided their expert hydromining services to Karara Mining Ltd, to assist with the removal of several years of built up material in the main process water and thickener feed tanks of the processing plant, in order to gain capacity in the tanks.

Our work involved pumps, water winning and high pressure submersibles and water cannons, discharging slurry into waste water dams via a second NPE installed pipeline. The project was conducted within a 72 hour window during the plant shutdown. Fast and effective clean-up work! Services provided include scope, design, build, install, operate and demobilization, all within a critical 72 hour shutdown window.

Hydromining – Thickener Tank Clean

Requirements, Equipment and Images

  • Pumps of various capacities and applications (dragflow, HPU, submersibles)
  • HDPE pipeline
  • 3 x 2” Water cannons

Get in touch to discuss your requirements...

Call Us

NPE has not only one of the largest ranges of specialised equipment, but also the most qualified professionals in pumping and power generation in Australia.

Visit A Location

The NPE branch network is strategically positioned to service all parts of Australia. These hire branches are supported by a team of NPE representatives and field service crews.

© National Pump & Energy 2024

Website created by RJ New Designs