Dewatering Open Cut Iron Ore Mine

Design and develop a unique, flexible system which would provide efficient, effective dewatering services.

Water Management - Dewatering - Engineering

For this project the client needed us to design and develop a unique, flexible system which would provide efficient, effective dewatering services.

The system needed to be capable of automated control with built in capacity and redundancy. It needed to have a robust design. It also needed to be flexible, able to handle various flow rates and continue to operate within an active mining environment.

Once the design was completed, we built, installed and commissioned the new system, providing ongoing operational and maintenance support, as well as monitoring of the rental package.

Dewatering Open Cut Iron Ore Mine

Requirements, Equipment and Images

Design and develop a unique, flexible system which would provide efficient, effective dewatering services. Build, install and commission system. Provide ongoing maintenance and monitoring services.

  • Specialised electrical and diesel pump packages including:
  • 540hp diesel pump sets
  • Control & recording equipment
  • 300kVA gensets

Get in touch to discuss your requirements...

Call Us

NPE has not only one of the largest ranges of specialised equipment, but also the most qualified professionals in pumping and power generation in Australia.

Visit A Location

The NPE branch network is strategically positioned to service all parts of Australia. These hire branches are supported by a team of NPE representatives and field service crews.

© National Pump & Energy 2024

Website created by RJ New Designs