De-scale Slipped / Unstable Material

NPE was contracted to de-scale the slipped and unstable material at the Mount Gibson Iron Tallering Peak site, in Western Australia.

Hydromining - Project Management

NPE was contracted to de-scale the slipped and unstable material, utilizing engineered and remotely controlled high pressure / flow water cannons, at the Mount Gibson Iron Tallering Peak site, in Western Australia.

The High pressure/flow descaling service was completed on a day and night shift format, utilising four of our highly trained hydromining personnel. Oversaw the working of the slippage so as to collapse the material and render the area stable once again.

De-scale Slipped / Unstable Material

Requirements, Equipment and Images

  • Gorman Rup suction lift pump and motor
  • High pressure suction and discharge hose
  • Two stage booster pump and motor
  • Remotely controlled 6” water cannon
  • Submersible top-up pump and generator
  • Mobile workshop
  • Mine specified site vehicle

Get in touch to discuss your requirements...

Call Us

NPE has not only one of the largest ranges of specialised equipment, but also the most qualified professionals in pumping and power generation in Australia.

Visit A Location

The NPE branch network is strategically positioned to service all parts of Australia. These hire branches are supported by a team of NPE representatives and field service crews.

© National Pump & Energy 2024

Website created by RJ New Designs