NPE was contracted to de-scale the slipped and unstable material, utilizing engineered and remotely controlled high pressure / flow water cannons, at the Mount Gibson Iron Tallering Peak site, in Western Australia.
The High pressure/flow descaling service was completed on a day and night shift format, utilising four of our highly trained hydromining personnel. Oversaw the working of the slippage so as to collapse the material and render the area stable once again.