Bypass Pumping

Bypass Sewage Lift Pump Station during Upgrade Works

Bypass Pumping

Bypass Sewage Lift Pump Station during Upgrade Works

Bypass Pumping

Requirements, Equipment and Images

Bypass Pump Lift Station during upgrade works. Max design Flow 80 l/s @ 24m TDH. Sound Attenuated in Built up area.

  • 2 X BBA BA150E Pumps
  • 4000 Litre Fuel Cell
  • Custom HDPE manifold
  • Suction Hoses

Get in touch to discuss your requirements...

Call Us

NPE has not only one of the largest ranges of specialised equipment, but also the most qualified professionals in pumping and power generation in Australia.

Visit A Location

The NPE branch network is strategically positioned to service all parts of Australia. These hire branches are supported by a team of NPE representatives and field service crews.

© National Pump & Energy 2024

Website created by RJ New Designs