NPE completed a comprehensive de-scaling process, via high pressure water cannon, enabling a safe and stable area for a ventilation portal to be installed.
Loose rock, rubble and scale, in varying sizes, was successfully washed from the face during the project period. REL worked closely with the Xstrata Geotechnical Team and Project Managers to achieve a safe, fast, effective and efficient completion of the project.
Requirements
Comprehensive de-scaling via high pressure water cannon was undertaken, enabling a safe and stable area for a ventilation portal to be installed.
Equipment
- 90kw submersible water winning pump
- 150kva portable silenced generator
- 1050hp 2 stage booster pump
- Hydraulic power unit and operators cabin
- 150mm remotely controlled water cannon
- Mobile workshop
- All components required to effect full operational hook up