Chat with us, powered by LiveChat

Mine Pit Dewatering

Mining Client

Mine Dewatering

 

 

 

 

 

Requirements

Our client required dewatering of their primary pit with the flexibility to move the pumps around to enabling blasting and mining operations.

NPE provided two trailer mounted, highflow, self-priming pumps, with one standby unit, to pump up to a booster station. Duty is 300lt/sec @64m TDH.

The booster consisted of a breaktank with two large diesel driven pumps and through a 630mm discharge HDPE pipe.

Equipment

  • 3 x NPE 250-70-300HP Trailer Mounted Self-priming pumps
  • 30,000lt Break Tank
  • 2 x 550HP Diesel power frames
  • Manifold & assorted hosing & spooling
  • Flowmeters
  • 4,500lt fuel Pod

National Pump & Energy have the people, products and expertise to deliver on your project needs. For more information contact us today.

© 2019 National Pump & Energy | Web design and development RJ New Designs and Big Blue Creative.