Chat with us, powered by LiveChat

Water Management – Pumping - Project Management

Newmont – Boddington Gold Mine, Western Australia

Emergency Dust Suppression

Newmont Boddington Gold (NBG) were encountering dust issues at their Coarse Ore Stockpile (COS). As a rapid solution, NPE scoped, planned, supplied and installed a highly effective suppression system to control dust creation and drift.

This system involved a pressure rated ring main, several cannon connection points and a booster pump and cannon. The mobility of the cannon allowed it to be relocated around the perimeter of the COS enabling it to cater for different weather conditions such as wind direction.

NPE supplied a fully integrated system allowing for dust suppression compliance on the COS of one of the world’s largest gold mines.

Requirements

Emergency Dust Suppression on the Coarse Ore Stockpile (COS)

Equipment

  • Custom built high pressure flexible delivery lines
  • 100lt/sec at 10bar diesel drive pump unit
  • Stockpile ring-main with spigots and flanges supplied and installed
  • Flexible high pressure hose
  • Remote control high flow water cannon and generator
  • Various cannon nozzles

National Pump & Energy have the people, products and expertise to deliver on your project needs. For more information contact us today.

© 2018 National Pump & Energy | Web design and development RJ New Designs and Big Blue Creative.