Pumps - Project Management

Water Corporation Western Australia

Emergency Response Water Supply

NPE was proud to assist the Water Corporation Western Australia, when they needed a contractor to maintain goldfields fresh water supply and fire system contingency.

Services provided in conjunction with this project include: scope, design, engineer and construct fit for purpose, in yard system testing, certify, deliver, install, commission, provision of emergency response operational personnel 24/7 and onsite training for the contingent/back up emergency response portable water supply pumps to 700lt/sec @ 35bar.

 

Requirements

Full design, engineer and supply diesel powered high head high flow pump station to maintain goldfields fresh water supply and fire system contingency

 

Equipment

2500hp diesel power frames driving

350lt/sec @ 35bar

80kva generators

40kva generators

11kva generators

35,000lt bulk fuel supply system