Posts by Nicola Sebbes
West Dapto Dewatering & Water Treatment NSW
NPE is supporting critical sewer and water infrastructure works at West Dapto, the fastest-growing residential area in NSW outside Sydney, where 19,000 new homes are planned. The project includes over 9km of gravity sewer main (via open trenching and microtunnelling), 700m of rising main with 400m of HDD, a pump station upgrade, and nearly…
Read MoreNPE Shines at NT Resources Week 2025
National Pump & Energy (NPE) was proud to exhibit at NT Resources Week 2025 in Darwin, showcasing our cutting-edge pumping, power, and water treatment solutions to industry leaders across mining, energy, and environmental sectors. Our presence at the event included a fully branded exhibition booth, where our team engaged with attendees to highlight NPE’s capabilities…
Read MoreEnviroPacific: Former PDP2 Oily Wastewater Pond Remediation
NPE was contracted to undertake the design, installation and operation of the dewatering system for this project. The NPE inhouse Civil Construction Engineering team completed this work then ensured that the design was compliant with the external regulatory requirements. A highly skilled team of 6 were utilised to install the dewatering systems onsite over the…
Read MoreBroadbeach Dewatering & Water Treatment QLD
Iris Built has undertaken to build a monumental construction project on Broadbeach, Victoria & Albert. As part of this, the project required a 6 level basement over 4385square meters in size. The lowest excavation will be 20m below sea level (-20mAHD). Currently the excavation is to the 6th basement level and the remaining lift pits…
Read MoreAlkimos Seawater Desalination Plant Perth, WA
The Alkimos Seawater Desalination Plant (ASDP) – Stage 1 is a major infrastructure initiative aimed at delivering 50 gigalitres per annum of desalinated seawater to Perth’s Integrated Water Supply Scheme, with provision for future expansion to 100 GL per annum. The project also includes treatment of approximately 4.9 GL/year of groundwater and is being delivered…
Read MoreSewer Bypass of Naracoorte WWTP. Naracoorte SA
NPE were engaged to bypass the entire inflow to the Naracoorte WWTP whilst the clients existing Pump and Power infrastructure was being upgraded. Pumps capable of bypassing up to approximately 150 l/sec for stormwater ingress scenario. The NPE Telemetry Team assisted in setting up 24/7 monitoring and communication of all installations, allowing the NPE Adelaide…
Read MoreLife at NPE June 2025
Name: Scott Position: Sales Specialist – GoldfieldsRegion: Western Australia As we reach the halfway point of 2025, I’ve taken a moment to reflect on what has made this year so rewarding, both professionally and personally. Over the past six months, I’ve had the opportunity to travel extensively across the Goldfields – a region that I not…
Read MoreSewer Bypass, Victoria
NPE was engaged by our client to design and deliver a reliable sewer bypass system with a duty capacity of 50 litres per second at 60 metres head, complete with 100% redundancy. The system was configured to extract from two sewer manholes and discharge into an existing rising main. To ensure continuous performance monitoring and…
Read MoreWater Main Installation in the Town of Bassendean
DM Civil engaged NPE for the installation of approximately 90 meters of new water main in the Town of Bassendean, a project that required extensive dewatering, water treatment, and environmental management. The work involved tunnelling a sleeve from Ashfield Reserve under an existing rail line and two busy main roads, ultimately emerging at Railway Parade.…
Read MoreMcArthur River Mine Dewatering, NT
The McArthur River Mine, located on one of the world’s largest zinc and lead deposits, is located 970 kilometres southeast of Darwin. In late March, the site was heavily impacted by Tropical Cyclone Megan, which brought approximately 350 mm of rain in 48 hours, causing significant disruption to mining operations. NPE was engaged to manage…