Testimonials

 

“NPE were able to identify the required equipment for our specific operation. They even had it onsite and operational the same day, saving us time and money”.

Mr C. Cumner – All Coast Recyclers

 


 

“We are very happy with the service that we received from National Pump & Energy for our generator hire requirements. The attention to detail and support throughout the design, supply and site install was excellent and we would be more than happy to use them again for our requirements”.

Declan Sloan – Estimator/Contract Administrator – Mercedes Construction.

 


 

“NPE was the only company we could find with both the plant and technical aptitude to provide the well-engineered solution that we were provided with”.

Fitzroy River Water – Rockhampton, QLD

 


 

“Since the introduction of NPE pumps to site we have seen a significant improvement in our dewatering operations here at Deflector Gold Project.

The quality of your equipment, service and specialty expertise is outstanding and very much appreciated”.

Kim Nelson  – Project Manager – Maca Limited

 


 

” The team from NPE provided a fit for purpose and cost effective temporary pumping and pipeline solution to help us manage storm water and runoff during our landfill construction activities.

NPE took the time to understand our problem and provide a tailored pumping and pipeline system to our situation.

NPE was quick to mobilise an experienced team of personnel to install and commission the system, they were a capable self-managed team that understood our time constraints, but actively got on with job safely .

The NPE team were flexible enough to accommodate minor design changes to the pipeline system during installation.

Overall we were very happy with the system and the level of follow up service NPE has provided”.

David Taft – Director – Taft Engineering

 

© 2017 National Pump & Energy | Web design and development RJ New Designs and Big Blue Creative.