Power - Pumps - Project Management

Rio Tinto – Dampier Salt Limited, Western Australia

Temporary Sea Water Supply System

NPE provided power for temporary sea water transfer for pond zero at Dampier Salt Limited in Western Australia.

Our requirement was to enable sea water transfer of 5,000lt/sec to pond zero salt water evaporation pond whilst permanent pumping system undergoes refurbishment.

NPE got the job done for Rio Tinto and we can do it for you too.

Requirements

Power for temporary sea water transfer for pond zero

Equipment

  • 2 x 1250kva gensets
  • 2 x 1500kva 415 – 1000vsubstation
  • 7 x 220KW 1000v soft starters
  • 7 x 220 I000v electric motors
  • 1000mts 241.1 trailing cable
  • 2 x 900mm ultrasonic flow metres
  • Remote monitoring at customer control room and via internet

National Pump & Energy have the people, products and expertise to deliver on your project needs. For more information contact us today.

© 2018 National Pump & Energy | Web design and development RJ New Designs and Big Blue Creative.