Sydney Water required a bypass pumping solution so that repairs could be conducted on the aging sewage pump station.
NPE’s experienced wastewater team ensured the installation and operation of the system met all flow and capacity requirements.
The pumps utilised for the project were chosen for their reliability, low running costs, quiet operation and suitability for pumping the wastewater.