Fortescue Metals Group – Cloudbreak, Pilbara, Western Australia

Saline Reinjection Borefield

NPE supplied and installed a staged dewatering pipeline for the disposal of saline water back into the aquifer, to the Fortescue Metals Group at Cloudbreak, Pilbara.

Our work was recognized on this project, winning two awards, one with the Australian Water Association, the other with AWA Infrastructure Project Innovation Winner.

The scope of works and equipment included.

Pipe Work:

  • 20km x 630mm PN6.3
  • 4km x 355mm, 315mm and 250mm PN6.3

Additional Works:

  • Installation and set up of 20 x re-injection bores
  • Installation of isolation points, manifolds and tees pieces
  • Supplied and installed air/vacuum release assemblies
  • Transport of 20m Pipe lengths to work area
  • Excavation burial of pipes for sheet flow and stock crossings 300m spacings

Services provided include installation, freight, excavations and commissioning.

Requirements

Supply and installation of a staged dewatering pipeline for the disposal of saline water back into the aquifer.

Equipment

  • 20km x 630mm PN6.3
  • 4km x 355mm, 315mm and 250mm PN6.3
  • Installation and set up of 20 x re-injection bores
  • Installation of isolation points, manifolds and tees pieces
  • Supplied and installed air/vacuum release assemblies