BMA wanted to access a submerged coal gas seam, but in order to do so, they needed to remove fines from the pit.
NPE were engaged to supply a turnkey solution for the removal of the settled mine silts – SG 1.6 – utilising insitu and recycled water, 120lt/sec @ 30% solids recovery rate.