Pipeline Pre-commissioning

Complete operational pre-commissioning pumping system to supply filtered, treated water to pig launcher at 300lt/sec and 25bar at Bayu Undan Gas Pipeline.

Oil & Gas – Pipelines & Construction - Project Management

NPE provided expert services to client PSL/Conoco Phillips to complete the operational pre-commissioning of a pumping system to supply filtered, treated water to pig launcher at 300lt/sec and 25bar at Bayu Undan Gas Pipeline, in the Northern Territory.

Services provided include scope, design, construct and function test pumping package; installation and deployment of all land and marine components; commission and operate complete package; decommission and rehabilitate.

Pipeline Pre-commissioning

Requirements, Equipment and Images

  • Offshore pontoons and anchoring systems
  • Electrically driven suction lift pumps
  • 500kva diesel generators
  • Break Tank with primary filtration screens
  • Rotary self-cleaning filters
  • Chemical dosing pumps
  • 750hp high head, high volume flood pumps
  • Certified flow meters
  • High pressure hose, spools and valves
  • Twin 500m floating HDPE pipelines
  • Complete site power and lighting

Get in touch to discuss your requirements...

Call Us

NPE has not only one of the largest ranges of specialised equipment, but also the most qualified professionals in pumping and power generation in Australia.

Visit A Location

The NPE branch network is strategically positioned to service all parts of Australia. These hire branches are supported by a team of NPE representatives and field service crews.

© National Pump & Energy 2024

Website created by RJ New Designs