Pumps - Project Management

Water Corporation Western Australia

Emergency Response Water Supply

NPE was proud to assist the Water Corporation Western Australia, when they needed a contractor to maintain goldfields fresh water supply and fire system contingency.

Services provided in conjunction with this project include: scope, design, engineer and construct fit for purpose, in yard system testing, certify, deliver, install, commission, provision of emergency response operational personnel 24/7 and onsite training for the contingent/back up emergency response portable water supply pumps to 700lt/sec @ 35bar.



Full design, engineer and supply diesel powered high head high flow pump station to maintain goldfields fresh water supply and fire system contingency



2500hp diesel power frames driving

350lt/sec @ 35bar

80kva generators

40kva generators

11kva generators

35,000lt bulk fuel supply system

National Pump & Energy have the people, products and expertise to deliver on your project needs. For more information contact us today.